JBS Dokhina Haowa
OngoingResidential · Sector 16/C, Uttara, Dhaka

JBS Dokhina Haowa

A royal, classic-style sanctuary in the heart of Uttara.

Floors

10

Apartment Size

2,250 sq.ft.

Parking

9

Units

9

Orientation

South & West

Front Road

Land Size

5 katha

01The Vision

A residence shaped by light, stillness, and Japanese restraint.

JBS Dokhina Haowa offers a royal experience with classic style. Luxurious and modern, located in Uttara, the apartment is a cozy sanctuary for relaxing dwellers and a great starting point for exploring the city's diversified surroundings.

Concept detail
02Gallery

Walk through JBS Dokhina Haowa.

Exterior 1
Exterior 2
Exterior 3
Exterior 4
Exterior 5
Exterior 6
Exterior 7
Exterior 8
Exterior 9
Exterior 10
Exterior 11
Exterior 12
03Specifications

The full datasheet.

Address
Plot 02, Road 2/A, Sector 16/C, Uttara, Dhaka 1230
Land Size
5 katha
Front Road
Orientation
South & West
Total Units
9
Number of Floors
10
Parking
9 spaces
Apartment Size
2,250 sq.ft.
Arrangement
4 Beds · 4 Baths · Living · Family Living · Dining · Kitchen · 4 Verandahs · Servant Bed with Bath
Handover
June 2026
Architect
Norm Associates · Tokyo / Dhaka
Structural Consultant
Osaka Structural Engineering
Status
Ongoing
04Floor Plans

Three configurations.

Floor plan Type A

Type A

2,400 sq.ft.

Bedrooms
3
Bathrooms
4
Balconies
2
Living + Dining
1 + 1
Kitchen
Open island
05Amenities

Built into every day.

  • A — 2,250 sft. (Single Unit)
  • 04 Beds, 04 Baths & Servant Bed with Bath
  • G+09 (10 Storied Building)
  • Community Space with washroom
  • BBQ Zone
  • Greenery
  • Open Terrace
  • Korean origin Lift
  • Generator
  • Sub-Station
  • Central Water Purifier
  • Deep Tube Well
06Location & Connectivity

Nearby

  • Gulshan-2 Circle5 min drive
  • Apollo Hospital12 min drive
  • American Intl. School8 min drive
  • Unimart / Gulshan DCC Market4 min drive
  • Hatirjheel Lake10 min drive
  • Hazrat Shahjalal Airport25 min drive
07Construction Progress

68% complete.

  • Q1 2024

    Groundbreaking

    Complete

  • Q3 2024

    Foundation complete

    Complete

  • Q2 2025

    Structure topped out

    Complete

  • Q4 2027

    Handover

    Scheduled

08Virtual Walkthrough

Explore every corner before you visit.

3D tour preview
09Pricing & Booking

A transparent payment journey.

  1. 01

    Booking Money

    10% on agreement signing

  2. 02

    Down Payment

    20% within 60 days

  3. 03

    Construction Linked

    60% across 8 milestone installments

  4. 04

    At Handover

    10% balance + registration

Bank financing partners

CITY BANKDBBLEBLSTANDARD CHARTERED

Request pricing

Detailed price sheet sent within 24h.

10Project Team

Architect

Norm Associates

Tokyo / Dhaka

Structural Consultant

Osaka Structural Engineering

Osaka

Japanese Design Partner

Takeda & Co.

Tokyo

Share this project