Komorebi Heights
OngoingResidential · Gulshan 2, Dhaka

Komorebi Heights

Light filtered through trees, made permanent in stone.

Floors

14

Apartment Size

2,400 sq.ft.

Parking

96

Units

48

Orientation

South

Front Road

30 ft.

Land Size

12.5 katha

01The Vision

A residence shaped by light, stillness, and Japanese restraint.

Komorebi Heights is conceived around the principle of ma — the quality of negative space. Every floor plate balances built mass with breathing room. Materials are specified to age with grace: brushed steel, ash hardwood, and hand-troweled lime plaster. The result is a home that feels considered, not constructed.

Concept detail
02Gallery

Walk through Komorebi Heights.

Exterior 1
Exterior 2
Exterior 3
03Specifications

The full datasheet.

Address
Gulshan 2, Dhaka, Bangladesh
Land Size
12.5 katha
Front Road
30 ft.
Orientation
South
Total Units
48
Number of Floors
14
Parking
96 spaces
Apartment Size
2,400 sq.ft.
Handover
Q4 2027
Architect
Norm Associates · Tokyo / Dhaka
Structural Consultant
Osaka Structural Engineering
Status
Ongoing
04Floor Plans

Three configurations.

Floor plan Type A

Type A

2,400 sq.ft.

Bedrooms
3
Bathrooms
4
Balconies
2
Living + Dining
1 + 1
Kitchen
Open island
05Amenities

Built into every day.

Building Features

  • Generator (100% backup)
  • CCTV surveillance
  • Smart access control
  • Fire detection
  • EV charging

Community Amenities

  • Rooftop infinity pool
  • Fitness centre
  • Children's play area
  • Community hall
  • Prayer room

Smart Living

  • Home automation
  • Solar panels
  • Rainwater harvesting
  • Smart parking
  • Concierge app
06Location & Connectivity

Nearby

  • Gulshan-2 Circle5 min drive
  • Apollo Hospital12 min drive
  • American Intl. School8 min drive
  • Unimart / Gulshan DCC Market4 min drive
  • Hatirjheel Lake10 min drive
  • Hazrat Shahjalal Airport25 min drive
07Construction Progress

68% complete.

  • Q1 2024

    Groundbreaking

    Complete

  • Q3 2024

    Foundation complete

    Complete

  • Q2 2025

    Structure topped out

    Complete

  • Q4 2027

    Handover

    Scheduled

08Virtual Walkthrough

Explore every corner before you visit.

3D tour preview
09Pricing & Booking

A transparent payment journey.

  1. 01

    Booking Money

    10% on agreement signing

  2. 02

    Down Payment

    20% within 60 days

  3. 03

    Construction Linked

    60% across 8 milestone installments

  4. 04

    At Handover

    10% balance + registration

Bank financing partners

CITY BANKDBBLEBLSTANDARD CHARTERED

Request pricing

Detailed price sheet sent within 24h.

10Project Team

Architect

Norm Associates

Tokyo / Dhaka

Structural Consultant

Osaka Structural Engineering

Osaka

Japanese Design Partner

Takeda & Co.

Tokyo

Share this project